LOTTERY ROUND 202
The @badnews giveaway for Sunday 14.04.19 Freebitcoin weekly lottery, just enter before the lottery draw takes place 14.04.19 Sunday at 16:30 GMT to be in with a share of 50% of any winnings on these Freebitcoin tickets paid in Steem (or in $SBD).

To enter either UPVOTE this post OR leave a comment with code 1311 ONLY in the Reply, comments that contain more than the code listed may not get properly entered. Comments that do not contain the code WILL NOT be entered into the draw.

One entry per account
Every entry will get an equal payout
0.001 Steem (or 0.001 $SBD) minimum payout
Thank you for participating!

100% Referral Share - payout every Sunday
Our user ID: 14249631
Sign Up
At the moment we have 7 Referrals. Thank you very much, together we are stronger!

| The @badnews calendar of 100% & 50% giveaway contests: |
|---|
| Freebitcoin lottery - every Sunday (steemit post: every Wednesday - 4 days before the lottery) |
| 100% Steem giveaway contest - random day of week (+7 days draw takes place) |
| EuroJackpot lottery - every Friday (steemit post: every Thursday - 1 day before the lottery) |
The last 31.03.19 Freebitcoin lottery 201 - ID: 14249631 summary: win 0.00000000 BTC = 0.000 $SBD = 0.000 Steem
Total win for participants of giveaway contests: 7.330 $SBD 3.497 SP
I try to bring the more FIAT back to the CRYPTO
Please support to buy more tickets for 100% & 50% giveaway contests:
Freebitcoin 100% Referral Share - payout every Sunday
Sign Up
Freedogecoin is sister website of Freebitcoin
Sign Up
ClaimBitcoinNetwork has 2 Google Android apps + website faucet
Sign Up
Binance is a cryptocurrency exchange platform
Buy or sell STEEM via Sign Up
Users can receive a 25% discount on trading fees by paying with the BNB tokens

@steemauto
Anyone is able to support their favorite authors by giving them an automatic upvote after publishing any post. If you don't want to miss any post from your friends, or favorite authors, just give them an auto upvote!
Steemauto will upvote on time, with your configurations, with specific upvote weight!

