installer, tiler, carpenter, kitchen installer, plumber ... they all come

2rm7jrvy1l.png
Source
Friday the 15th is the day.... We have made apointments with a lot of people who are going to build or reconstruct a piece of our house. It was quiet difficult to get everbody around the same time because everbody had busy agenda's, only the problem is that the current owners still live there and it is difficult to get the room for measurement of all stuff... By we've made it :)

Painter
m8otlmf3c3.png
Source

The inside of the house need to be painted and perhaps plastered, that's still to be decided. But all the wooden window frames and indoor doors need a new paint. While the glas repairman comes along also the new placed window frames on the outside has to be painted. So we are still thinking of giving the complete outside too a new paint.

glass repairman
olmx5ut2gf.png
Source
Because we want to only use electricity in our house and no gas anymore we have to renew the windows with H++ glas to get the house more well isolated.

Tiler
05h96d52ep.png
Source
The bathroom and toilet downstairs have to be renewed with a new shower, toilets etc. Last weekend we ordered new tiles for these two rooms. So that has to be done too :) And I can asure you, it's something I can't do myself.

Kitchen Installer
ic754xuy6j.png
Source
As you may have read in one of my previous posts we already bought a new kitchen. The kitchencompany will install the kitchen but before that the plumber has to (just as in the bathroom) rearrange the pipes. Also the kitchen runs on full electric.

floor layer
3f4zlfnmc2.png
Source
We have chosen for a wooden floor in a fishbone format with on the side a black strip. Our good friend Ronnie (who owns a floorshop) will install the floor for us.

Solar specialist
gcm3ip3r8p.png
Source
In our current house we've just installed (half a year ago) solar panels on the roof. Besides the environmental pro's it's also interesting for saving power for home use so I will save money. Because of the fact we will be gasless we are going to use a lot of more electricity, therefor we are installing 36 solarpanels on the roof. With that we are self-sufficient even with a heatpump.
The heatpump is also going to be installed by a installer.

Carpenters
t6wuuxc6jd.png
Source
On the atic we are placing two Dormer for the new room of our oldest sun. This has to be placed by a carpenter(s). They are comming too to measure the roof and the room. When they have made a technical drawing we have to send that to the local government for a permit to build.

dhdpwa3bb6.png
Source
There is no direct stairs to the atic now, there is this loft ladder which you have to pull down. When we place the dormers it will be a full size room so we sacrificing one room on the second level for a direct stairs. That room will also being used to store our clothes in a closet.

xfib9fr1y4.png
I also need the carpenters to (help me) build my "Ski hut", or our (me and my sons) mancave. I tried to draw one in a 3d program but the middle wall is to far on the right. The inside should be a bit bigger than the outside. But I am really looking forward to have my first beer there :)

So a you can see, plenty work to do and a lot of planning challenges :) But we are so ready for it and looking forward to it....

Have a great day


Alt text
Proud member of SMG


I fully support @s3rg3 and @exyle, who are witness with their developer group @blockbrothers for the Steem blockchain. If you want to support them, they would appreciate your vote here.


They are the creators of Steemify, THE notification app for your Steemit account for IOS.


steem-banner.jpg

H2
H3
H4
Upload from PC
Video gallery
3 columns
2 columns
1 column
16 Comments